• Home
  • About
  • Contact Us
  • Filming at Railtown

Railtown 1897 State Historic Park

Current Events at the Jamestown Shops

Feeds:
Posts
Comments
« Wow. Another Tuesday
Jacket Planning »

Lagging Complete!

April 16, 2010 by Railtown Staff

tony

Tony Stroud reams one of the final holes on the crosshead guides. The smokebox overhead will remain devoid of insulation.

phil

Phil Hard finishes off the week by finishing off the lagging! Ready for final jacket measurements on Monday.

The boiler is insulated with rigid sheets of calcium silicate which are scored (and cut where necessary) and held into place with wire.  They will be neatly covered with a sheet-metal jacket as the final layer.

About these ads

Share this:

  • StumbleUpon
  • Digg

Like this:

Like Loading...

Posted in Boiler, Crossheads & Guides, Sierra No. 3 |

  • Enter your email address to subscribe to new posts by email.

    Join 199 other followers

  • Categories

    • 1265
    • Boiler
    • Closure
    • Crossheads & Guides
    • Driving wheels
    • Equipment
    • Events
    • Frame
    • History
    • In the News
    • Maintenance
    • No. 7 Caboose
    • Restoration
    • Rivetting
    • Rods and rod brass
    • Sacramento Shops
    • Shop Tours
    • Sierra No. 3
    • Sierra Ry No. 2 Lima 1922 3T Shay
    • Staff
    • Tender
    • Volunteers
  • Attendance

    • 132,491 blog visitors
  • Top Posts

    • Filming at Railtown
    • Detailed History of the Sierra #3
    • Memorial Day Weekend at Railtown 1897
    • About
    • Bethany Crouch from KTXL Fox 40 Visits Railtown
    • All-American Weekend at Railtown 1897 State Historic Park!
    • Contact Us
    • Cast Iron Welding
    • Railtown 1897 Steam Train Operating Season Opens April 2-3
    • Santa's Starlight Express Shines Bright!

Blog at WordPress.com.

Theme: MistyLook by WPThemes.


Follow

Get every new post delivered to your Inbox.

Join 199 other followers

Powered by WordPress.com
%d bloggers like this: