Crunch Time-Today in the Shop

On Thursday, October 29th, the #3 will be shipped back to Railtown.  Consisting of the new boiler, the chassis and the driving wheels, it doesn’t quite look like a locomotive. . . yet.  To ensure the ship date is met, it’s all hands on deck, and a long week ahead.  Here’s a look at what could be seen in the shop today. 
Al DiPaulo and George Sapp adjust the rigging for the final lift of the boiler, while the documentary film crew looks on.

Al DiPaolo and George Sapp adjust the rigging for the final lift of the boiler, while the documentary film crew looks on.

Lisa Smithson and Don Shapiro scrape the bearing surfaces of the driving boxes in preparation for the final fit.

Lisa Smithson and Don Shapiro scrape the bearing surfaces of the driving boxes in preparation for the final fit.

Don Shapiro applies machinist's blue dye to the axles of the driving wheels for testing of the driving boxes.

Don Shapiro applies machinist's blue dye to the axles of the driving wheels for testing of the driving boxes.

Lisa Smithson operates the crane while Leonard Jones rocks the box back and forth over the dye-covered axle.  An examination of the stained bearing surface indicates what still needs to be scraped and the process is repeated until the surface is perfectly married.

Lisa Smithson operates the crane while Leonard Jones rocks the box back and forth over the dye-covered axle. An examination of the stained bearing surface indicates what still needs to be scraped and the process is repeated until the surface is perfectly married.

Dennis "DJ" Ponder grinds down the proud rivets on the boiler.

With the boiler on the ground for the final time, Dennis "DJ" Ponder grinds down the proud rivets, while being documented by the film crew.

Al DiPaulo and Leonard Jones adjust the mag drill for reaming the furnace bearer strap holes into the frame.  One of the last items needed prior to the final fitting of the boiler.

Al DiPaolo and Leonard Jones adjust the mag drill for reaming the furnace bearer strap holes into the frame. One of the last items needed prior to the permanent attachment of the boiler.

Phil Hard and DJ Ponder adjust a mag drill to ream holes for the running board studs.

Phil Hard and DJ Ponder adjust a mag drill to ream holes for the running board studs.

George Sapp cuts stock for bolts at the end of the day, foreshadowing Monday's activities.

George Sapp cuts stock for bolts at the end of the day, foreshadowing Monday's activities.