More Scenes Around the Shop

Skilled volunteers have been essential to this project.

Skilled volunteers have been essential to this project.

George Sapp reviews bolt specifications with Randy Mathews, while Jim Bays machines bolts in the background.

George Sapp reviews bolt specifications with Randy Mathews, while Jim Bays machines bolts in the background.

Drawing for two different lengths of the tie down bolts.

Drawing with specifications for two different lengths of the tie down bolts.

Three stages of the saddle bolt manufacturing process.

Three stages of the saddle bolt manufacturing process.

George Sapp and Al DiPaolo working late into the night to get the furnace bearer holes reamed.

George Sapp and Al DiPaolo working late into the night to get the furnace bearer holes drilled, reamed, and tapped.

Reaming the furnace bearer holes (done by hand, but the drill is used as a guide).

Reaming the furnace bearer holes (done by hand, but the drill is used as a guide).

Tapping the threads is the final step.

Tapping the threads is the final step.

Advertisements