Homecoming

oct 30 2009 014

Brendan Simunaci and Mark Johnston attach the oversized load banner to the pilot truck.

With pilot car in place, we're in the final stretch.

With pilot car in place, we're in the final stretch.

Onto 5th Avenue in Jamestown, some tricking driving was required to avoid low-hanging communications lines.

Onto 5th Avenue in Jamestown, some tricky driving was required to avoid low-hanging communications lines.

And then, finally, we were in the yard!

And then, finally, we were in the yard!

With the truck, and front of the trailer removed, the crew laid out the track ramp for remove of the locomotive.

With the truck, and front of the trailer removed, the crew laid out the track ramp for unloading.

George then drove the diesel and a flatbed car through the shop.

George then drove the diesel and a flatbed car through the shop.

The car then couples to the front of the locomotive, and it is carefully brought down the ramp.

The car then couples to the front of the locomotive, and it is carefully brought down the ramp.

Finally in the Tri Dam shop!  Ready for work to resume on Monday morning.

Finally in the Tri Dam shop! Ready for work to resume on Monday morning.

Advertisements